Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online more than two weeks ago

Candidate

Male, 48 years, born on 13 May 1976

Not looking for a job

Brovary, willing to relocate (Other regions, Egypt, Tashkent, Turkey), prepared for business trips

Piping supervisor, construcrion supervisor

Specializations:
  • Other

Employment: full time

Work schedule: full day

Work experience 18 years 1 month

August 2020January 2021
6 months
"DUGLAS ALIANCE"

Guinea, ru.duglasalliance.com

Power Industry... Show more

Head of the production department
Coordination and organization of work employees. Management of work on the operational regulation of the course of work. Leading the development of calendar schedules. Organization and control of document flow. Organization of operational control over the progress of work, monitoring the timing of construction and installation work. I provide daily operational records of the progress of work (cumulative, summary, daily fact and plan information). Organization and control of document flow. Coordination of work of production departments. Reporting to higher management: head of construction management. Archive with design and acceptance documentation.
April 2019February 2020
11 months
"RODINA"

Kyiv, rodinaeg.com

Power Industry... Show more

Construction Manager
JSC «RODINA» Kyev, solar power plants place of work Ukraine - development and monitoring of the calendar schedule projects construction of industrial solar power plants. - management and coordination of internal working groups and sub-contractors; - organization of the process of development of design documentation; - organization and holding of tenders, signing contracts with subcontractors; - monitoring the implementation of the project budget; - supervision of subcontractors, evaluation of suppliers, quality control and timing of construction and installation works; - organization of the process of commissioning and commissioning of facilities; - management of as-built documentation and transfer of the object to the Customer;
October 2017April 2019
1 year 7 months
"RENTECHNO"

Kyiv, rentechno.ua

Power Industry... Show more

Construction Manager
JSC «RENTECHNO» Kyev, solar power plants place of work Ukraine «Ryhta» 1МWt, «Lesovie Grinevci» 2,2 MWt, Tavanskaya 3 5,8MWt, Asteriya 5,6MWt. - development and monitoring of the calendar schedule projects construction of industrial solar power plants. - management and coordination of internal working groups and sub-contractors; - organization of the process of development of design documentation; - organization and holding of tenders, signing contracts with subcontractors; - monitoring the implementation of the project budget; - supervision of subcontractors, evaluation of suppliers, quality control and timing of construction and installation works; - organization of the process of commissioning and commissioning of facilities; - management of as-built documentation and transfer of the object to the Customer;
April 2014June 2017
3 years 3 months
"POWER MACHINES"

Russia, power-m.ru/

Heavy Engineering... Show more

Senior specialist
Construction of Barh 3x660 MW TPP (turbine island) place of work India Erection and commissioning group (erection of high and low pressure pipelines, auxiliary equipment for the turbine hall) Specialist of the erection and commissioning department - technical assistance and control of assembly work on pipelines and turbine auxiliary equipment (turbine island) - interaction with the managers and leading engineers of the subcontractor in solving current issues arising at the site (collisions, working with drawings, diagrams, design errors, etc.) - carrying out the final stages of erection of high and low pressure pipelines (flushing and hydraulic testing) - delivery of the pipeline from the erection to the customer's quality department, as well as to representatives of the IBR boiler inspection - providing engineering support for the claim part of the work - organization of the provision of engineering support in solving technical problems arising during the erection and commissioning works - preparation of letters on technical issues - technical supervision from the start of preparatory work on erection to commissioning of the object - control over the development and maintenance of project documentation - work according to ASME standards - work with reclamations, drawing up acts of fault detection, acts of non-compliance, etc.
July 2012June 2013
1 year
"POWER MACHINES"

India, power-m.ru/

Heavy Engineering... Show more

Senior specialist
Construction of Barh 3x660 MW TPP (turbine island) place of work India Erection and commissioning group (erection of high and low pressure pipelines, auxiliary equipment for the turbine hall) Senior specialist of the erection and commissioning group - leadership and coordination of the erection team of high and low pressure pipelines and auxiliary equipment ; - technical assistance and control of erection work on pipelines ; - interaction with managers and leading engineers of the subcontractor in solving current issues arising at the site (collisions, working with drawings, diagrams, etc.) ; - carrying out the final stages of erection of high and low pressure pipelines (flushing and hydraulic testing) ; - delivery of the pipeline from erection to the customer's quality department, as well as to representatives of the boiler inspection (IBR)
August 2009June 2012
2 years 11 months
"POWER MACHINES"

India, power-m.ru/

Heavy Engineering... Show more

Senior specialist
Construction of TPP Sipat 3x660 MW (turbine island) place of work India Erection and commissioning group (erection of high and low pressure pipelines, auxiliary equipment for the turbine hall) Senior specialist of the erection and commissioning group - coordination and control over the work of subcontractors in terms of erection work ; - interaction with managers and leading engineers of the subcontractor in solving current issues arising at the site (collisions, working with drawings, diagrams, etc.) ; - carrying out the final stages of erection of pipelines and the heat mechanical equipment (washing and hydraulic tests) ; - delivery of the pipeline from erection to the customer's quality department, as well as to representatives of the boiler inspection (IBR) ; - monitoring compliance with the technology of work, technological processes, projects of work, quality of work and labor protection requirements
May 2008August 2009
1 year 4 months
"YUZHTEPLOENERGOMONTAZH"

Kyiv, www.utem-group.com/ua/

Power Industry... Show more

Projects manager
OJSC «YUZHTEPLOENERGOMONTAZH», Kiev, Ukraine Place of work Ukraine UTEM-Engineering, General Project Management Head of the complex - organization of erection works at the entrusted objects (auxiliary equipment, pipelines, foundations, metal structures) at the construction of the Krasnoarmeisk concentrator, Krasnoarmeisk ; - organization of overhaul of boiler equipment and its transfer to commissioning at Kramatorsk thermal power station, Kramatorsk ; - organization and control of timely and high-quality execution of the tasks set by contracting companies.
May 2007April 2008
1 year
"TECHNOPROMEXPORT"

Bangladesh, tpe-vo.ru

Power Industry... Show more

Engineer
TPP Obra, India - reconstruction of 2 blocks of 50 MW work place India Engineer group service and support - development of technical specifications, coordination and execution ; - erection, overhaul, reconstruction of heat-mechanical equipment and pipelines, rotating mechanisms ; - selection of pumping equipment, according to the required technical parameters ; - correspondence with the customer and equipment suppliers ; - work with reclamations, drawing up acts of fault detection, acts of non-compliance, etc.
October 2006April 2007
7 months
"KHARKOVENERGOREMONT"

Bangladesh, khaer.com.ua

Power Industry... Show more

Master in the overhaul of pumping equipment
OJSC «KHARKOVENERGOREMONT», Kharkov, Ukraine, place of work Bangladesh Reconstruction of the TPP Ghorasal, Bangladesh - erection and reconstruction of heating equipment Master in the overhaul of pumping equipment - erection of blower fans and smoke exhausters ; - Work with a team of subcontractor specialists ; - advice from a foreign subcontractor
June 2006September 2006
4 months
"KHARKOVENERGOREMONT"

India, khaer.com.ua

Power Industry... Show more

Specialist/foreman
OJSC «KHARKOVENERGOREMONT», Kharkov, Ukraine, place of work India Reconstruction of TPP Obra, India - erection and repair of heating equipment Brigadier for the overhaul of pumping equipment - installation of pumping equipment and pipelines of the turbine hall. ; - management experience and interaction with subcontractors and the customer.
September 2003December 2005
2 years 4 months
"TECHNOPROMEXPORT"

Bangladesh, khaer.com.ua

Power Industry... Show more

Technical expert
FSUE ``VO'' «TECHNOPROMEXPORT», Moscow, Russia, place of work Bangladesh Construction of TPP Sidirganch, Bangladesh - erection, revision, commissioning and warranty maintenance of mechanical erection equipment Leading expert on pumping group and rotating power station mechanisms - revision, erection, and operation of rotating mechanisms ; - control, inspection, and commissioning of thermal mechanical equipment
January 2001June 2003
2 years 6 months
ZMIEVSKAYA TPP

Комсомольское

Power Industry... Show more

Fitter
JSC «CENTERENERGO», pos. Komsomolsky, on installation and repair of gas turbine equipment.

Skills

Skill proficiency levels
Ответственность

About me

Functions and tasks performed by me on projects: HPP "Senge" Hydropower (Equatorial Guinea) Head of PTO Participation in the preparation of monthly, weekly and daily plans for construction and installation work of Contractors, subdivisions of their own forces and their adjustment in the course of work; Operational control over the progress of planned works: - for concreting of the Dam, section 7; - drilling wells for cementation and cementation works at the Dam, section 7; -on the concreting of anchor supports M1 on the 3rd, 4th lines of pressure water conduits; -on combination of work on concreting horizontal sections of pressure water conduits and installation of metal links of the facing of pressure water conduits. - for auxiliary production (fulfillment of orders in the reinforcement shop) -for drilling and blasting operations at a stone quarry; -for budgets of type WB, NB with the preparation of relevant documents -Monitoring and control over the progress of construction and installation work on the implementation of daily assignments for work by Sections No. 1, No. 5, No. 7. -Coordination of construction work with the work of contractors for the installation of pressure water pipes, the application of AKZ and grouting works. -Coordination of the work of supervising engineers at the construction site in the field of work. --- Drawing up and control over the implementation of weekly and monthly work plans (calendar schedule), followed by summing up the results of the work (report). - Coordination and accounting of applications for receipt of goods and materials and fixed assets by the divisions of the Company (except for the car fleet) and Contractors. - Drawing up a daily report on the progress of construction and installation work and a plan for construction and installation work -Participation in operational meetings. Solar power plants (Ukraine) Tavanska 8 MWp (UA), Lisovi Grinivci 3.6 MWp (UA), Mihailovka 10 MWp (UA), Auli 3.6 MWp (UA), Stara Ushitsya 1_3.2 MWp (UA), Stara Ushitsya 2_3.2 MWp (UA), Asteria 5.8 MWp (UA) Supervised projects for the construction of solar power plants: He conducted tenders for the search for contractors, together with logisticians participated in tenders for the supply of equipment, drawing up schedules, reports, progress reports, presentations in the course of work on projects. Experience in running three projects at the same time. Monitoring the provision of materials and equipment to the construction site. Start-up and commissioning of the power plant. Control of connection to networks and obtaining a green tariff, as well as all permits. All power plants are in operation! TPP Barkh 3x660 MW (turnkey turbine hall) India During the implementation of this project, the tasks were the same as for the project of the TPP "Sipat" Due to the lack of funding from the Customer, the project was not implemented as planned. My participation in this project ended with the installation of the main systems of the turbine island systems. TPP "Sipat" 3x660 MW (turnkey turbine island) India Supervised the installation of all 112 pipeline systems, as well as TMO (auxiliary turbine equipment). Subordinate to the contractor and 400 people of the installation personnel. Resolving all issues that were the reason for stopping the installation, starting with planning and ending with writing letters to the design institute in the event of collisions. Under my leadership and myself, hydraulic tests of pressure feed pipelines with a pressure of 630 kg were carried out! The project was successfully completed, three power units were put into operation! GOK "Krasnoarmeysk" (turnkey) Ukraine Supervised the complex of works on the construction of the GOK project Installation of mining and processing equipment. Acceptance of completed works. Checking the acts of completed work. Working with collisions. TPP "Obra" 4 x50 MW (reconstruction) India Supervised the reconstruction of the fuel oil facilities of the TPP. Supervised overhaul of dust preparation equipment (mill, mill fan). TPP "Gorozal" 4x50 MW (reconstruction) Bangladesh Reconstruction of a 50 MW unit. Under my leadership, together with the contractor, a major overhaul of the electric feed pump was carried out, the unit was installed and repaired. TPP "Sidirganch" 210 MW (turnkey) Bangladesh EPC project. Supervised the contractor involved in the installation and commissioning of pumping units, such as the pumping group of the turbine hall, the pumping group of the chemical department, the onshore pumping station, as well as the rotating mechanisms of the boiler room (draft fans, smoke exhausters). The TPP was built and put into operation. Zmievskaya TPP Ukraine After graduation, he worked as a mechanic for the repair of equipment in the turbine hall.

Higher education

2000
Kharkov State Polytechnic University
Diploma

Languages

RussianNative


EnglishA1 — Basic


Citizenship, travel time to work

Citizenship: Ukraine

Permission to work: Russia

Desired travel time to work: Doesn't matter