Functions and tasks performed by me on projects:
HPP "Senge" Hydropower (Equatorial Guinea)
Head of PTO
Participation in the preparation of monthly, weekly and daily plans for construction and installation work of Contractors, subdivisions of their own forces and their adjustment in the course of work;
Operational control over the progress of planned works:
- for concreting of the Dam, section 7;
- drilling wells for cementation and cementation works at the Dam, section 7;
-on the concreting of anchor supports M1 on the 3rd, 4th lines of pressure water conduits;
-on combination of work on concreting horizontal sections of pressure water conduits and installation of metal links of the facing of pressure water conduits.
- for auxiliary production (fulfillment of orders in the reinforcement shop)
-for drilling and blasting operations at a stone quarry;
-for budgets of type WB, NB with the preparation of relevant documents
-Monitoring and control over the progress of construction and installation work on the implementation of daily assignments for work by Sections No. 1, No. 5, No. 7.
-Coordination of construction work with the work of contractors for the installation of pressure water pipes, the application of AKZ and grouting works.
-Coordination of the work of supervising engineers at the construction site in the field of work. --- Drawing up and control over the implementation of weekly and monthly work plans (calendar schedule), followed by summing up the results of the work (report).
- Coordination and accounting of applications for receipt of goods and materials and fixed assets by the divisions of the Company (except for the car fleet) and Contractors.
- Drawing up a daily report on the progress of construction and installation work and a plan for construction and installation work
-Participation in operational meetings.
Solar power plants (Ukraine)
Tavanska 8 MWp (UA), Lisovi Grinivci 3.6 MWp (UA), Mihailovka 10 MWp (UA), Auli 3.6 MWp (UA), Stara Ushitsya 1_3.2 MWp (UA), Stara Ushitsya 2_3.2 MWp (UA), Asteria 5.8 MWp (UA)
Supervised projects for the construction of solar power plants:
He conducted tenders for the search for contractors, together with logisticians participated in tenders for the supply of equipment, drawing up schedules, reports, progress reports, presentations in the course of work on projects. Experience in running three projects at the same time. Monitoring the provision of materials and equipment to the construction site. Start-up and commissioning of the power plant. Control of connection to networks and obtaining a green tariff, as well as all permits. All power plants are in operation!
TPP Barkh 3x660 MW (turnkey turbine hall) India
During the implementation of this project, the tasks were the same as for the project of the TPP "Sipat"
Due to the lack of funding from the Customer, the project was not implemented as planned. My participation in this project ended with the installation of the main systems of the turbine island systems.
TPP "Sipat" 3x660 MW (turnkey turbine island) India
Supervised the installation of all 112 pipeline systems, as well as TMO (auxiliary turbine equipment). Subordinate to the contractor and 400 people of the installation personnel. Resolving all issues that were the reason for stopping the installation, starting with planning and ending with writing letters to the design institute in the event of collisions.
Under my leadership and myself, hydraulic tests of pressure feed pipelines with a pressure of 630 kg were carried out!
The project was successfully completed, three power units were put into operation!
GOK "Krasnoarmeysk" (turnkey) Ukraine
Supervised the complex of works on the construction of the GOK project
Installation of mining and processing equipment. Acceptance of completed works. Checking the acts of completed work. Working with collisions.
TPP "Obra" 4 x50 MW (reconstruction) India
Supervised the reconstruction of the fuel oil facilities of the TPP. Supervised overhaul of dust preparation equipment (mill, mill fan).
TPP "Gorozal" 4x50 MW (reconstruction) Bangladesh
Reconstruction of a 50 MW unit. Under my leadership, together with the contractor, a major overhaul of the electric feed pump was carried out, the unit was installed and repaired.
TPP "Sidirganch" 210 MW (turnkey) Bangladesh
EPC project. Supervised the contractor involved in the installation and commissioning of pumping units, such as the pumping group of the turbine hall, the pumping group of the chemical department, the onshore pumping station, as well as the rotating mechanisms of the boiler room (draft fans, smoke exhausters). The TPP was built and put into operation.
Zmievskaya TPP Ukraine
After graduation, he worked as a mechanic for the repair of equipment in the turbine hall.