LLP "PSI Stroy Industriya" (PIESAI Stroi Industriya)
Atyrau, www.psi-group.kz
Construction, Real Estate, Architecture... Show more
Mechanical/Piping engineer
Project: construction of the Combined Cycle Power Plant (capacity - 310 Megawatts) on the Karabatan industrial area.
Implementation on behalf of the contractor construction control over the performance of construction and installation works and verification of installed equipment.
Control over the implementation of capital construction plans, compliance with the scope, timing and quality of construction and installation works, as well as the quality of materials, products, designs of approved design estimates, working drawings, construction norms and rules, standards, technical conditions, labor protection regulations.
I spend daily bypassing the construction site to monitor the progress of construction, namely:
• Control of equipment installation according to the project.
• To identify the necessary changes to continue construction.
• Using my experience and skills, I give recommendations to the construction and installation team to eliminate the deficiencies.
• In the places of problems with the installation of technological pipelines, I create a technical request to the customer to make changes to the design data in order to continue the construction process. All decisions on making changes should be made within the framework of the standards of the Republic of Kazakhstan, and therefore has the case that it is necessary to take into account all factors.
• By measuring the distance from metal structures to TX pipelines, I create drawings for the manufacture of supports from channels, angles, I-beams. Before issuing the created drawings to the production department, I make calculations for the stress resistance of these supports relative to the mass of the pipeline load, which depends on the wall thickness, type of material, length of the pipeline, its diameter in inches.
• Checking compliance with all conditions in the paint shop, according to the flow chart. Check the relative humidity, temperature, drying time, the thickness of the painting. Creating a list of paints and solvents required for painting pipelines depending on the system and on the presence of insulation, you must give instructions on the type of color painting.
Participation in the decision on issues related to the introduction of changes in the projects in connection with the introduction of more advanced technological processes, volumetric-planning and constructive solutions that ensure cost reduction and improvement of technical and economic indicators of construction and reconstruction facilities.
I take part in the review and approval of the project design changes arising during the construction, I solve the issues of replacing materials, products, and structures, if necessary, without reducing the quality of the construction projects.
The study of the causes causing the failure of the timing and deterioration of the quality of construction and installation work, I take measures to prevent and eliminate them.
Implementation of technical acceptance of completed construction and installation works and facilities, registration of necessary technical documentation.
Participation in the work of commissions for the acceptance of construction materials and their delivery for installation works (RSI). Request for stored item.
Control of quality of elimination by construction and installation teams of imperfections, defects in the established terms.
Keeping records of completed construction and installation works and preparing the necessary data for reporting on the implementation of capital construction plans.