Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online yesterday at 14:01
Candidate
Male, 35 years, born on 15 April 1989
Not looking for a job
Astrakhan, willing to relocate (Other regions, Jordan, Qatar, Kingdom of Saudi Arabia, UAE, Turkey), prepared for business trips
qc inspector, civil supervisor
80 000 ₽ in hand
Specializations:
- Other
Employment: full time
Work schedule: flexible schedule, rotation based work
Work experience 7 years 8 months
November 2018 — December 2019
1 year 2 months
Kvaerner
www.kvaerner.com/en/About-us/Who-we-are-and-what-we-do/
Civil QC Engineer
civil supervision
Nord Stream 2 project
September 2014 — July 2018
3 years 11 months
Saipem S.p.A., Anapa branch
Anapa
Civil QC Supervisor
Monitoring the construction contractors’ quality-control, on-site construction
supervision for civil works, analysing survey reports, maps, drawings, incoming
material control (concrete structures), checking as-build documentation
(выполнение строительного контроля, входной контроль материалов)
January 2014 — September 2014
9 months
Saipem S.p.A., Astrakhan branch
Civil QC Inspector
supervision for earth civil works, analysing survey reports, maps, drawings, incoming
material control (concrete structures), checking as-build documentation
December 2012 — December 2013
1 year 1 month
Saipem S.p.A., Astrakhan branch
CONCRETE WEIGHT COATING INSPECTOR (CWC)
INCOMING PIPE INSPECTION FOR BOTH 22”AND 28”PIPES
- All pipes prior to beginning and during execution of unloading operations at production facility of SVAP-YUG, LLC will be subjected to check the thickness of 3LPE by using Elcometer 356 thickness gauge. And visual inspection for detection of damages if occurred during transportation especially with regard to corrosion protection coating (three-layer polyethylene) and pipe ends. All checks will be recorded to material acceptance reports and damaged pipes will be marked/quarantined.
BODY OF PIPE - To ensure that body of pipe has not been damaged or attacked by corrosion during transportation.
PROTECTIVE POLYETHYLENE COATING- Ensure polypropylene coating has not been scratched during transportation. All damages should be recorded.
DURING ASSEMBLY- Inspection/Monitoring of holiday test for both 28&22 inch pipes, it is necessary to control the insulating coating integrity using the Holiday detector throughout the whole pipe length, prior to installation of steel reinforcement cage, and metal polymeric jacket/to be ready
for concrete coating (INJECTION).
CONCRETE WEIGHT COATED PIPE- During final inspection. Check/Monitor the length of pipe ends uncoated concrete pipe (cut back), concrete thickness and take the readings of weight of the concrete coated of each pipe and spot record.
February 2012 — December 2012
11 months
AstrakhanArchProject
engineer-designer
Designing of the reinforced-concrete structures, such as cast-in-place concrete walls, stairs, columns, slabs of multistoried buildings, designing reinforced concrete and metal structures of storage water facilities, boiler house, administrative building of the Production Base at 7 "A" Magistralnaya Str., Astrakhan region, Russia for "Schlumberger Logelco Inc."
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category B, CAbout me
Visual and measuring testing certificate of 2nd level
▪ Construction supervision certificate
▪ Basic Knowledge about the ISO 9001: 2008 QMS standard
▪ Readiness for business trips;
▪ No bad habits
competent with most Microsoft Office programs
Higher education
2011
Astrakhan State Technical University, Russia
Construction, Designing of industrial and civil buildings software systems on structural analysis
2011
Astrakhan State Technical University, Russia
humanitarian, Translator for expert communities
Languages
Citizenship, travel time to work
Citizenship: Russia
Permission to work: Russia
Desired travel time to work: Doesn't matter