Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online yesterday at 14:01

Candidate

Male, 35 years, born on 15 April 1989

Not looking for a job

Astrakhan, willing to relocate (Other regions, Jordan, Qatar, Kingdom of Saudi Arabia, UAE, Turkey), prepared for business trips

qc inspector, civil supervisor

80 000  in hand

Specializations:
  • Other

Employment: full time

Work schedule: flexible schedule, rotation based work

Work experience 7 years 8 months

November 2018December 2019
1 year 2 months
Kvaerner

www.kvaerner.com/en/About-us/Who-we-are-and-what-we-do/

Civil QC Engineer
civil supervision Nord Stream 2 project
September 2014July 2018
3 years 11 months
Saipem S.p.A., Anapa branch

Anapa

Civil QC Supervisor
Monitoring the construction contractors’ quality-control, on-site construction supervision for civil works, analysing survey reports, maps, drawings, incoming material control (concrete structures), checking as-build documentation (выполнение строительного контроля, входной контроль материалов)
January 2014September 2014
9 months
Saipem S.p.A., Astrakhan branch
Civil QC Inspector
supervision for earth civil works, analysing survey reports, maps, drawings, incoming material control (concrete structures), checking as-build documentation
December 2012December 2013
1 year 1 month
Saipem S.p.A., Astrakhan branch
CONCRETE WEIGHT COATING INSPECTOR (CWC)
INCOMING PIPE INSPECTION FOR BOTH 22”AND 28”PIPES - All pipes prior to beginning and during execution of unloading operations at production facility of SVAP-YUG, LLC will be subjected to check the thickness of 3LPE by using Elcometer 356 thickness gauge. And visual inspection for detection of damages if occurred during transportation especially with regard to corrosion protection coating (three-layer polyethylene) and pipe ends. All checks will be recorded to material acceptance reports and damaged pipes will be marked/quarantined. BODY OF PIPE - To ensure that body of pipe has not been damaged or attacked by corrosion during transportation. PROTECTIVE POLYETHYLENE COATING- Ensure polypropylene coating has not been scratched during transportation. All damages should be recorded. DURING ASSEMBLY- Inspection/Monitoring of holiday test for both 28&22 inch pipes, it is necessary to control the insulating coating integrity using the Holiday detector throughout the whole pipe length, prior to installation of steel reinforcement cage, and metal polymeric jacket/to be ready for concrete coating (INJECTION). CONCRETE WEIGHT COATED PIPE- During final inspection. Check/Monitor the length of pipe ends uncoated concrete pipe (cut back), concrete thickness and take the readings of weight of the concrete coated of each pipe and spot record.
February 2012December 2012
11 months
AstrakhanArchProject
engineer-designer
Designing of the reinforced-concrete structures, such as cast-in-place concrete walls, stairs, columns, slabs of multistoried buildings, designing reinforced concrete and metal structures of storage water facilities, boiler house, administrative building of the Production Base at 7 "A" Magistralnaya Str., Astrakhan region, Russia for "Schlumberger Logelco Inc."

Skills

Skill proficiency levels
Adobe Acrobat
Driving Licence B
MS Office
AutoCAD
ISO 9001:2008

Driving experience

Own car

Driver's license category B, C

About me

Visual and measuring testing certificate of 2nd level ▪ Construction supervision certificate ▪ Basic Knowledge about the ISO 9001: 2008 QMS standard ▪ Readiness for business trips; ▪ No bad habits competent with most Microsoft Office programs

Higher education

2011
Astrakhan State Technical University, Russia
Construction, Designing of industrial and civil buildings software systems on structural analysis
2011
Astrakhan State Technical University, Russia
humanitarian, Translator for expert communities

Languages

RussianNative


EnglishA1 — Basic


Citizenship, travel time to work

Citizenship: Russia

Permission to work: Russia

Desired travel time to work: Doesn't matter